Project Detail:
The facility will be located at Riyadh, Saudi Arabia. The core objective of the new data center is to improve on the manageability, reliability and resilience of the data center facilities and to meet UTI Tier III Standards’ requirements for Pre-Fabricated Data Centers from Huawei. Azura Consultancy Engineering has performed the conceptual Data Center Design and feasibility study for various cooling methods including direct/indirect evaporative cooling to achieve the lowest possible PUE and O&M costs for the data center.
The total plot area is estimated to be (10,000 to 12,000 Sqm.), whitespace (1,200-1,500 Sqm. for Day-1 and 600-900 Sqm. For Day-2.
ICT rack densities ranging from 5kW up to 15KW. Total ICT load of 5.6MW (3.2MW for Day-1 and 2.4 MW for Day-2)