Project Detail:
Conceptual Data Center Design for a new expansion to the existing facility in the nearby newly purchased plot by Etisalat. The expansion plot area is approximately 3,500 m2 with total IT load of Approx. 5-6MW with 2500-3000 sqm of white space using Huawei prefabricated modular solution. Different options using Dynamic Rotary UPS (DRUPS) and on-site Generators had been designed.